BEGIN:VCALENDAR VERSION:2.0 PRODID:-//https://www.iccmontereybay.org/mmp_upgrade//NONSGML kigkonsult.se iCalcreator 2.29.29// CALSCALE:GREGORIAN METHOD:PUBLISH UID:13632ff2-886a-4620-8fda-4b28800e5265 X-WR-CALNAME:JCal Pro Calendar X-WR-CALDESC:Your online events calendar X-WR-TIMEZONE:America/Los_Angeles BEGIN:VTIMEZONE TZID:America/Los_Angeles BEGIN:STANDARD TZNAME:PST DTSTART:20231105T020000 TZOFFSETFROM:-0700 TZOFFSETTO:-0800 RDATE:20241103T020000 END:STANDARD BEGIN:DAYLIGHT TZNAME:PDT DTSTART:20240310T020000 TZOFFSETFROM:-0800 TZOFFSETTO:-0700 RDATE:20250309T020000 END:DAYLIGHT END:VTIMEZONE BEGIN:VTIMEZONE TZID:America/Monterrey BEGIN:STANDARD TZNAME:CST DTSTART:20221030T020000 TZOFFSETFROM:-0500 TZOFFSETTO:-0600 END:STANDARD END:VTIMEZONE BEGIN:VEVENT UID:20150729T143000UTC-406042@http://www.iccmontereybay.org/ DTSTAMP:20240328T103809Z CATEGORIES:Training CATEGORIES:Events DESCRIPTION:
NORTHERN CALIFORNIA CHAPTER OF THE
\nINTERNATIONAL ASSOCIATION OF
\nELECTRICAL INSPECTOR S
\nBI-MONTHLY CHAPTER MEETING
\n\n
PRESENT ATION TOPIC: Install ation of Electric Vehicle Service Equipment &\; Charging Infrastructure
\n
\n
WHEN: WEDNESDAY\, July 29\, 2015\, 9:30 a.m. to 2:00 p.m.
\nWHERE: L ocal 234 JATC\, 10300 Merritt St.\, Castroville\, CA 95012
\nCOST: $20.00 for LUNCH &\; REGISTRATION
\n\n
PLEASE JOIN US FOR THE GENERAL MEETING\ , INDUSTRY REPORTS\, EDUCATIONAL PROGRAM\, LUNCH AND CODE DISCUSSION
\n\n
Would you like to inc rease your knowledge and understanding of the NEC?
\nOur meetin g this month will cover the installation of Electric Vehicle Charging Equi pment (EVSE) and related infrastructure per Article 625 of the NEC. Topic s covered will include general installation requirements such as load calc ulations\, load management\, existing service calculations\, disabled acc ess regulations (for commercial and MFD applications)\, metering\, NEC-rel ated issues\, new CalGreen requirements\, etc. Everything you always want ed to know about EVSE installations but didn’t know to ask. Effective Jul y 1\, 2015\, CalGreen requires most new residential and non-residential co nstruction to be “EV-ready”. Also\, Governor Brown has mandated that ther e be 1.5 million Zero Emission Vehicles (ZEV) on the road in California by 2025. So this will be timely and relevant information.
\nChargepo int manufactures their own EVSE equipment and are based in Campbell\, CA. They have extensive experience both in California and nationwide with the installation of EVSE networks and also multi-family dwelling and commerc ial EVSE applications.
\n\n
We will also have general code discussion of th e NEC\, so bring your code questions and get them answered!
DTSTART;TZID=America/Monterrey:20150729T093000 DTEND;TZID=America/Monterrey:20150729T140000 SUMMARY:Installation of Electric Vehicle Service Equipment & Charging Infra structure URL:https://www.iccmontereybay.org/mmp_upgrade/index.php/calendar/23-defaul t/26-training/123-chargepoint X-ALT-DESC;FMTTYPE=TEXT/HTML:NORTHERN CALIFORNIA CHAPTER OF THE
\nINTERNATIONAL ASSOCIATION OF
\nELE CTRICAL INSPECTORS
\nBI-MONTHLY CHAPTER MEETING
\n\n
PRESENTATION TOPIC: Installation of Electric Vehicle Service Equipment &\; Chargi ng Infrastructure
\nSPEAKER: Jeremy Hall\, Solutions Engineer\, Chargepo int
\n\n
\n
WHEN: WEDNESDAY\, July 29\, 2015\, 9:30 a.m. to 2:00 p.m.
\nWHERE: Local 234 JATC\, 10300 Merritt St.\, Castroville\, CA 950 12
\nCOST: $20.00 for LUNCH &\; REGISTRATION
\n\n
PLEASE JOIN US FOR THE GENERAL MEETING\, INDUSTRY REPORTS\, EDUCATIONAL PROGRAM\, LUNCH AND CODE DISCUSSION
\n\n
Our meeting this month will cover the installation of Electric Vehi cle Charging Equipment (EVSE) and related infrastructure per Article 625 o f the NEC. Topics covered will include general installation requirements such as load calculations\, load management\, existing service calculatio ns\, disabled access regulations (for commercial and MFD applications)\, m etering\, NEC-related issues\, new CalGreen requirements\, etc. Everythin g you always wanted to know about EVSE installations but didn’t know to as k. Effective July 1\, 2015\, CalGreen requires most new residential and n on-residential construction to be “EV-ready”. Also\, Governor Brown has m andated that there be 1.5 million Zero Emission Vehicles (ZEV) on the road in California by 2025. So this will be timely and relevant information.
\nChargepoint manufactures their own EVSE equipment and are based i n Campbell\, CA. They have extensive experience both in California and na tionwide with the installation of EVSE networks and also multi-family dwe lling and commercial EVSE applications.
\nCome join us for this informative presentation!
\np>\n
We will also have general code discussion of the NEC\, so bring your code questions and get them answere d!
END:VEVENT END:VCALENDAR